• google+
  • facebook
  • twitter
  • linkedin
  • youtube
language

+8617731766260/18233754501+8617731766260/18233754501

fan@saikenpumps.comfan@saikenpumps.com
new products
  • Heat Transfer Oil Pump - Hot oi

    We're professional Heat Transfer Oil Pump manufacturers and suppliers in China high quality products with competitive price. We warmly welcome you to buy Hot oil circulating pump from our factory...

    read more
latest news

1 inch GRACO diaphragm pump per

1 inch GRACO diaphragm pump perfect replacement Air Operated Diaphragm Pump Model:SKQ-25ASTFF Max Capacity:150LPM, Max pressure:8.4Bar Material Body/Diaphragm/Valve ball/Valve seat: PP/Teflon/PTFE/PTFE Pump Inlet Outlet:1/1 (flange type), A...

Installation of magnetic pump

2020-07-24

Installation of magnetic pump
1. Make the concrete foundation according to the installation size of the pump
2. Before installation, check the pump and motor. All parts should be intact and there should be no debris in the pump.
3. Put the unit on the foundation, put a pair of wedge pads between the floor and the foundation, and adjust the wedge pads to align them. After adjusting the level of the pump, tighten the anchor bolts;
4. The suction and discharge pipelines of the pump should have brackets, which cannot be supported by the pump;
5. After the installation is completed, finally use the Pandong coupling to check whether there is any plug-in phenomenon, and the installation is over if it rotates easily and evenly;
6. The SS magnetic pump is strictly forbidden to extract media with particles;
7. In order to prevent debris from entering the pump, a filter should be installed at the inlet, and the filtering area should be 3-4 times larger than the cross-sectional area of ​​the pipeline;
8. The pump with high head should also be equipped with a check valve on the outlet pipe to prevent water hammer from sudden shutdown.
9. It is necessary to ensure that the installation height of the pump conforms to the turbidity margin of the pump, and consider the loss of the pipeline and the temperature of the medium;
10. When the temperature is too high, cooling measures should be taken to prevent the static ring of the mechanical seal from cracking.
11. Before driving, the pump should be filled with the liquid to be delivered (if the pump is sucking), close the outlet valve, and connect the power supply;
12. Turn on the power supply and check whether the rotation direction of the pump is correct;
13. Slowly open the outlet valve, adjust to the required performance point, and test run the unit for 5-10 minutes. If there is no abnormal phenomenon, it can be put into operation;
14. When shutting down, close the outlet valve first, and then cut off the power supply;
15. Regularly check pumps and motors, and replace vulnerable parts;
16. When the pump is not in use for a long time, the internal flow passage of the pump should be clear and the power supply should be cut off.
   

the professional team to service !

    If you have questions or suggestions,please leave us a message,we will reply you as soon as we can!