• google+
  • facebook
  • twitter
  • linkedin
  • youtube
language

+8617731766260/18233754501+8617731766260/18233754501

fan@saikenpumps.comfan@saikenpumps.com
new products
  • Heat Transfer Oil Pump - Hot oi

    We're professional Heat Transfer Oil Pump manufacturers and suppliers in China high quality products with competitive price. We warmly welcome you to buy Hot oil circulating pump from our factory...

    read more
latest news

1 inch GRACO diaphragm pump per

1 inch GRACO diaphragm pump perfect replacement Air Operated Diaphragm Pump Model:SKQ-25ASTFF Max Capacity:150LPM, Max pressure:8.4Bar Material Body/Diaphragm/Valve ball/Valve seat: PP/Teflon/PTFE/PTFE Pump Inlet Outlet:1/1 (flange type), A...

Installation and precautions of magnetic pump

2020-08-03

Installation of magnetic pump
1. Make a concrete foundation according to the installation size of the pump; 2. Before installation, check the pump and motor, all parts should be intact, and there should be no debris in the pump; 3 Put the unit on the foundation, between the floor and the foundation Put a pair of wedge pads, adjust the level of the pump by adjusting the wedge pads, and tighten the anchor bolts after adjustment; 4. The suction and outlet pipes of the pump should have a bracket, which cannot be supported by the pump; 5. Installation When finished, use the Pandong coupling to check whether there is any interference. If it rotates easily and evenly, the installation is over; 6. The magnetic drive pump is strictly forbidden to extract media with particles; 7. In order to prevent debris from entering the pump, it should be installed at the inlet The filter area should be 3-4 times larger than the cross-sectional area of ​​the pipeline; 8. A check valve should be installed on the outlet pipeline of the pump with high lift to prevent sudden shutdown of water hammer. 9. The installation height of the pump must be ensured Comply with the steam turbidity margin of the pump, and consider the pipeline loss and medium temperature; 10. When the temperature is too high, cooling measures should be taken to prevent the static ring of the mechanical seal from cracking. 11. Before driving, fill the pump with the liquid to be delivered (if the pump is sucking up), close the outlet valve, and connect the power supply; 12. Turn on the power supply and check whether the rotation of the pump is correct; 13. Open the outlet slowly Adjust the valve to the required performance point, and test run the unit for 5-10 minutes. If there is no abnormal phenomenon, it can be put into operation; 14. When stopping, close the outlet valve first, and then cut off the power supply; 15. Regularly check the pump and motor , Replace vulnerable parts; 16. When the pump is not in use for a long time, the flow channel in the pump should be clear and the power supply should be cut off. 17. Dry operation is strictly prohibited.

gear pump

 
   

the professional team to service !

    If you have questions or suggestions,please leave us a message,we will reply you as soon as we can!